Pearson Construction Builds Multi-Purpose Animal Facility for Local Humane Society

Designed and Built with Purpose: Pearson Construction Completes New Multi-Purpose Animal Facility for the Humane Society of Southwestern Michigan

Pearson Construction is proud to have designed and built a meaningful new multi-purpose animal facility for the Humane Society of Southwestern Michigan – a space created with animal care, daily functionality, and long-term community use in mind.

From the earliest planning stages through construction, the project reflects Pearson’s integrated approach to building. Pearson’s in-house architectural design team helped shape a facility that would meet the Humane Society’s practical needs, while Pearson Construction crews brought that vision to life with careful attention to durability, cleanliness, access, and everyday use.

The result is a flexible new space that gives the Humane Society more options for caring for animals in a safe, controlled environment.

A Facility Designed Around Animal Care

The new facility gives animals room to safely exercise when outdoor conditions are not ideal – whether it is too hot, too cold, or simply not the right setting for animals to be outside.

It also provides a separate space for specialized care, including medical procedures, immunizations, spay and neuter services, and isolation when animals are sick or need to be kept apart from the general population. By creating a dedicated area separate from the main building, the Humane Society can better support infection control, animal safety, and the flow of daily operations.

This type of thoughtful planning is exactly where Pearson’s design-build approach adds value. The facility was not designed as a generic animal space. It was designed around how the Humane Society’s team would actually use it – day after day.

Built for Cleanliness, Durability, and Daily Use

Inside the facility, Pearson crews constructed a space built to handle the realities of animal care.

Easy-to-clean epoxy floors, hose spigots throughout the space, ventilation, and trench drains were incorporated to help staff clean efficiently and maintain a sanitary environment. The floor can be hosed down, and the trench drain system helps manage water and cleaning needs in a practical, durable way.

For a facility that supports animals, cleanliness is more than a convenience – it is essential. Every finish and feature was selected with the daily work of the Humane Society in mind.

The facility also includes dedicated kennel areas for animals with different needs. Some kennels are intended to provide a quieter, calmer setting for elderly dogs that may not do as well in the general population. A larger kennel area was included for pregnant animals or animals with litters, giving the Humane Society more flexibility when caring for vulnerable animals.

A Flexible Space for the Community

While the facility was designed first and foremost for animal care, it was also built to serve a broader community purpose.

The open space can be used for presentations, community education, and small gatherings. With room for tables, presentation equipment, and flexible programming, the building gives the Humane Society a space that can adapt as needs change.

It is more than an animal care area. It is a multi-purpose facility designed to support the organization’s mission, its staff, its veterinary partners, and the community members who care about animal welfare in Southwestern Michigan.

A Project Made Possible Through Generosity

A project like this takes vision, planning, construction expertise, and meaningful community support. The facility was made possible in large part through the generosity of Mary C. Grish, whose significant support helped bring the building to reality.

Her vision was for a dedicated building that could stand apart from the main facility while serving a clear and compassionate purpose. Today, that vision has become a lasting space for animals, staff, veterinary partners, and the broader community.

Designed In-House. Built by Pearson. Built for Care.

At Pearson Construction, we believe the best buildings are designed around the people – and in this case, the animals – who will use them every day.

This project is a strong example of what happens when design and construction work together from the start. Pearson’s in-house architectural design team helped plan a space that would function well for the Humane Society, and Pearson Construction crews built it with the durability and detail needed for everyday animal care.

We are honored to have played a role in creating this important new facility for the Humane Society of Southwestern Michigan and grateful to be part of a project that will support animal welfare in our community for years to come.

This is the kind of work that reminds us why we build.

Pearson Construction. WE BUILD. For the Community

Connect with our team to see how we can bring your vision to life.

Partnership with Vail and Cornerstone Alliance

An Economic Driver for southwest Michigan

Pearson Construction Vice-President, Greta- Pearson-Barrons speaking at Vail Rubber Works Royalton Township Facility.

Pearson Construction has maintained a decades-long partnership with both Cornerstone Alliance and Vail Rubber Works — a relationship built on mutual trust, shared vision, and a deep commitment to the economic vitality of southwest Michigan. At a recent event, held at Vail Rubber Works’ Royalton Township facility, Pearson Construction Vice-President, Greta Pearson-Barrons spoke about the enduring relationship with Vail Rubber Works and how it exemplified the strength of local industry partnerships. Everyone in attendance had a chance to tour Vail’s 40,000 sq. ft. facility, constructed by our team at Pearson Construction, as part of phase one at the Royalton township location. Phase two is currently underway, where we are erecting three additional steel spaces as part of a massive expansion project for the plant – which specializes in high-performance rubber and polyurethane roll covers. The entire construction project is expected to be complete by year end.

Pearson-Barrons father, Burt Pearson II, Pearson Construction President, shared how alliances between Cornerstone, Vail and Pearson Construction have played a crucial role in creating jobs, supporting manufacturing, and driving economic development across the community. Here’s more from Burt Pearson II, on his company’s work with Vail throughout the years.  Listen below in this video.

 

 

Learn more about our Commercial, Industrial, and Institutional services and projects by clicking on Services in our Menu. 

Pearson-Barrons Featured in ACTIONLINE

Pearson Construction’s Vice-President Greta Pearson-Barrons is featured in the first edition of the Southwest Michigan Regional Chamber‘s recently re-released ACTIONLINE Magazine. Pearson-Barrons, who serves as the Vice President of Pearson Construction Company, recently took over as Vice Chair of the SMRC Board of Directors. Read More below in Volume 1, Issue 1 April 2025 Edition of ACTIONLINE Magazine.

Constructing Top-Notch Athletic Facilities

How to Create Winning Athletic Facilities for High Schools and Colleges

When it comes to building top-notch athletic facilities, our team at Pearson Construction knows how to collaborate with school districts and architects.  Our commitment to communication and teamwork ensures that every project flows seamlessly from concept to completion. With a hands-on approach and the involvement of ownership at every stage, our General Contracting team brings a unique understanding that leads to superior results tailored to meet community needs.

Whether it’s synthetic turf for year-round play or comprehensive planning for diverse athletic spaces, we’re all about making your vision a reality. We worked with Architect, Tony Leininger, from CARMI Design Group on Berrien Springs Public Schools‘ Sylvester Stadium. Leininger shares more about our professional relationship, and why the collaboration worked so well.

Our athletic facility project with Berrien Springs Public Schools, constructing Sylvester Stadium, spanned thousands of square feet and included team rooms, locker spaces, concessions, and a press box.

Key features of the athletic facility include the decision to use synthetic turf, allowing for year-round use, which was a significant consideration in the design. The project required thorough communication and regular progress meetings among all parties involved, including subcontractors and the school district. Leininger’s testimonial stresses the value of having a family-owned business like Pearson Construction that prioritizes owner involvement and supports local educational initiatives – demonstrating our commitment to community engagement and workforce development.

Embracing Community Involvement

YMCA Niles Buchanan Athletic Facility
Niles-Buchanan YMCA Gymnasium Addition – Built by Pearson Construction

A pivotal aspect of any construction project is its impact on the local community. Modern projects are not just about bricks and mortar; they represent a commitment to enhancing the local environment. By involving community members in the planning stages, developers can address concerns, gather insights, and foster a sense of ownership among residents. That was the case for the Niles-Buchanan YMCA. The organization enlisted the help of the surrounding community to raise funds to pay for construction of a new gymnasium, teen center, and dance classrooms. This collaborative approach resulted in more responsive designs that cater to the needs of the people who use these facilities. This reinforces community ties and generates greater support for the project, ensuring robust relationships long after completion.

5 Key Elements of Successful Sports Facility Construction

To construct a top-notch athletic facility, several key elements must be considered:

1. **Space and Design**  The facility should encompass ample space, typically around 7000 square feet, with areas designated for team rooms, locker rooms, concessions, community restrooms, and a press box. The design should facilitate a variety of sports, such as including a multi-sport arena capable of hosting different athletic events.

Berrien Springs Sylvester Stadium Athletic Facility2. **Field Surface**  Choosing the right surface is crucial. Opting for synthetic turf allows for year-round use of the facility, minimizing downtime due to weather conditions and supporting more consistent play.

3. **Community Involvement**  Engaging with the community throughout the construction process is essential. Regular communication and progress meetings should involve not only the construction team but also stakeholders and community members to ensure the facility meets local needs and expectations.

4. **Experienced Team**  Working with an experienced construction management team that values collaboration is critical. Their ability to mediate between stakeholders and address concerns during the project can lead to a superior end product. A good relationship with the builders can enhance the quality of construction and overall satisfaction.

5. **Sustainability and Future Planning** Integrating sustainable practices into the facility’s design and construction can lead to long-term benefits. This includes energy-efficient systems, environmentally friendly materials, and considerations for future upgrades.

Southwest Michigan College Gymnasium Addition
Southwest Michigan College Zollar Fieldhouse Building – Renovation by Pearson Construction

By focusing on these aspects, planners can create an athletic facility that not only meets current demands but also stands the test of time and continues to serve the community effectively. At Pearson, we know collaborative efforts in planning and execution can lead to successful outcomes in community-focused projects, fostering positive relationships and ensuring high-quality results. Contact our business development team to get started on your next school design or athletic facility project.

Pearson Interiors: Riverwood Center (Niles, MI)

It’s extremely rewarding when we can take an old building, with good bones, and reinvent it to match our client’s vision. This can be true whether our clients own the building, or rent it – the latter being the case for the project we completed for Riverwood Center in Niles, Michigan. Take a look at how we were able to address safety concerns, while taking two different suites and make them flow seamlessly into one, so Riverwood Center counselors can do what they do best, care for the mental health of the underserved population in that area.

 

Interested in seeing what we can do for a building you are interested in renovating for your business? Learn more about Pearson Interiors and Contact Our Team today!

Documents

Projects


tel mail fb insta